We build the new bridge next to the old one.
Mainstream maintenance for SAP PO 7.5 ends on 31 December 2027. EY and coalsoft move your integrations to SAP Integration Suite in waves, without downtime. We switch the old platform off only when no traffic is left on it.
THE OLD BRIDGE IS MAINTAINED FORMORE DAYSuntil 31 December 2027, the end of mainstream maintenance for SAP PO 7.5
What is happening
Mainstream maintenance for SAP PO 7.5 ends. After that, only paid extended maintenance until the end of 2030.
Source: SAP, SAPinsider
Java support ends at the end of 2030. From 2031, SAP NetWeaver AS Java 7.5 moves to customer-specific maintenance with no follow-on release.
Source: SAP News, 7 Oct 2026
of DSAG respondents still planning further investment in SAP ECC aim to move to S/4HANA by the end of 2027.
Two bridges, one managed flow of traffic
Live traffic moves gradually from the old bridge to the new one, without downtime. The table shows the share of traffic on both bridges in each of the six phases.
| Bridge | 01Design | 02Build | 03Wave 1 | 04Wave 2 | 05Waves 3–4 | 06Decommission |
|---|---|---|---|---|---|---|
| Old bridgeSAP PI/PO | 100 % | 100 % | ~85 % | ~50 % | ~10 % | removal |
| New bridgeIntegration Suite | design | foundations | ~15 % | ~50 % | ~90 % | 100 % |
Traffic shares are illustrative. The actual order and size of the waves come from the assessment.
How we build: four phases
Design
A 6-week assessment: inventory, Migrate · Adapt · Redesign · Retire, target architecture and a wave plan.
Build
Platform foundations: tenant, security, connectivity, monitoring, operating model. The old bridge keeps carrying traffic.
Migrate
Migration in waves. Each wave goes through testing, stabilisation and hypercare before the next one starts.
Decommission
Controlled removal: decommissioning, archiving, an end to dependencies and technical debt.
How big is the build ahead of you?
How to start
Bridge inspection
An introductory session on your PI/PO with an EY and coalsoft expert. We go through your structural check result and the next step.
Book a slotBlueprint
An assessment based on EY methodology: interface categories, target architecture, migration waves aligned with S/4HANA, a parallel-run model, costs and the delivery price.
Build and migrate
A pilot wave in 6–8 weeks, further waves, hypercare and controlled decommissioning of PI/PO. One EY and coalsoft team.
The build team
A new bridge next to the old one: 400 days until the end of SAP PO
What ends in 2027 and 2030, why a tool report is not enough, how parallel operation works and what the first step costs. Speakers: Honza Šťastný, Michal Uhlíř, Michal Pychtin, Adam Sehnoutka.
The webinar is held in Czech and Slovak.
Site diary
All articlesThe first article comes out on 10 November. Subscribe and you will not miss it.
Book a bridge inspection
45 minutes on your PI/PO, free and with no obligation. Our patron Michal Pychtin will get in touch.







