§01
SAP PI/PO → SAP INTEGRATION SUITE

We build the new bridge next to the old one.

Mainstream maintenance for SAP PO 7.5 ends on 31 December 2027. EY and coalsoft move your integrations to SAP Integration Suite in waves, without downtime. We switch the old platform off only when no traffic is left on it.

LIVE

THE OLD BRIDGE IS MAINTAINED FORMORE DAYSuntil 31 December 2027, the end of mainstream maintenance for SAP PO 7.5

§02

What is happening

31 Dec 2027

Mainstream maintenance for SAP PO 7.5 ends. After that, only paid extended maintenance until the end of 2030.

Source: SAP, SAPinsider

2030 / 2031

Java support ends at the end of 2030. From 2031, SAP NetWeaver AS Java 7.5 moves to customer-specific maintenance with no follow-on release.

Source: SAP News, 7 Oct 2026

37%

of DSAG respondents still planning further investment in SAP ECC aim to move to S/4HANA by the end of 2027.

Source: DSAG Investment Report 2026 (opens in a new tab)

§03
SAP PI/PO → SAP INTEGRATION SUITE

Two bridges, one managed flow of traffic

Live traffic moves gradually from the old bridge to the new one, without downtime. The table shows the share of traffic on both bridges in each of the six phases.

DIRECTION OF TRAFFIC TRANSFER
Share of traffic on the old and new bridge in the six migration phases
Bridge01Design02Build03Wave 104Wave 205Waves 3–406Decommission
Old bridgeSAP PI/PO100 %100 %~85 %~50 %~10 %removal
New bridgeIntegration Suitedesignfoundations~15 %~50 %~90 %100 %
6 phases · scroll horizontally
Old bridge share of traffic
New bridge share of traffic
design designed, not built yet
foundations construction started, no traffic
removal controlled shutdown

Traffic shares are illustrative. The actual order and size of the waves come from the assessment.

§04

How we build: four phases

  1. 01

    Design

    A 6-week assessment: inventory, Migrate · Adapt · Redesign · Retire, target architecture and a wave plan.

  2. 02

    Build

    Platform foundations: tenant, security, connectivity, monitoring, operating model. The old bridge keeps carrying traffic.

  3. 03

    Migrate

    Migration in waves. Each wave goes through testing, stabilisation and hypercare before the next one starts.

  4. 04

    Decommission

    Controlled removal: decommissioning, archiving, an end to dependencies and technical debt.

STRUCTURAL CHECK

How big is the build ahead of you?

12questions
~3minutes
PDFto download
Start the check
§05

How to start

STEP 0 · 45 MINUTES · FREE

Bridge inspection

An introductory session on your PI/PO with an EY and coalsoft expert. We go through your structural check result and the next step.

Book a slot
STEP 1 · 6 WEEKS · FIXED PRICE

Blueprint

An assessment based on EY methodology: interface categories, target architecture, migration waves aligned with S/4HANA, a parallel-run model, costs and the delivery price.

STEPS 2–3 · BASED ON THE ASSESSMENT

Build and migrate

A pilot wave in 6–8 weeks, further waves, hypercare and controlled decommissioning of PI/PO. One EY and coalsoft team.

§06

The build team

CONSTRUCTION DIRECTOR
Honza Šťastný
SAP Lead, EY
MAIN CONTRACTOR
Michal Uhlíř
CEO, coalsoft
BRIDGE PATRON
Michal Pychtin
Director, EY
CHIEF ARCHITECT
Peter Bujáček
Integration Expert, EY
SITE FOREMAN
Adam Sehnoutka
Integration Expert, coalsoft
§07
WEBINAR · THURSDAY, 26 NOVEMBER 2026 · 10:00–10:45 CET · ONLINE

A new bridge next to the old one: 400 days until the end of SAP PO

What ends in 2027 and 2030, why a tool report is not enough, how parallel operation works and what the first step costs. Speakers: Honza Šťastný, Michal Uhlíř, Michal Pychtin, Adam Sehnoutka.

The webinar is held in Czech and Slovak.

The first article comes out on 10 November. Subscribe and you will not miss it.

§08

Book a bridge inspection

45 minutes on your PI/PO, free and with no obligation. Our patron Michal Pychtin will get in touch.